Terrazzo Installation Sequence
-
Layout of Design
Craftsmen delicately lay out the metal stripping to separate the different elements of the design.
-
Pouring
Each section is poured separately with careful attention.
-
Grouting and troweling
Tiny air bubbles are filled in to establish a solid finish
-
Grinding complete
The floor is ground to reveal the interior of the aggregate.
-
Polish and Maintain
After grinding, the floor is polished and maintaned with proper care.